Project: build two new short sections, one extension on Slingshot after the two tables and adding one additional jump, and one reroute after Slingshot to have a flowy-er downhill. Meet Wahrani Trail Captain Mike Benton at 9:00 AM in the parking lot. He’ll bring the tools and his 4 wheeler. Bring your bike so you can ride in, and plenty of water. Mike and Bob already cut lumber, so planned work will be mostly raking and some bench cutting. Mike thinks this has the potential to be a fun section.